July 23 2024
We are nearing completion of our new 70,000 square foot state of the art steel fabrication facility. Three new plate, angle, flat and tube machines will automatically feed material into the drills and torches, accurately creating the holes and slots from our engineering CAD files. The material will be off loaded and in some cases go straight to the welders. Our accuracy and lead times on steel products will improve, safety will improve and a whole new world of possibilities will open for our steel transmission line designs. Stay tuned for the grand opening video!